Work performed:
- preparation of the construction site;
- marking plots for houses;
- drilling holes for piles;
- installation of reinforcement frames;
- installation of formwork;
- concreting of foundation elements;
- reinforcement of the monolithic plate;
- pouring of the concrete base;
- protection of the foundation in winter.
Work performed:
- continuation of foundation works on the sites;
- preparation of the base for monolithic plates;
- installation of formwork for concrete bases;
- knitting and laying of reinforcing mesh;
- reinforcement of monolithic slabs;
- pouring concrete bases for houses;
- the finalisation of individual foundation stages;
- drilling operations for the well;
- preparation of wooden structures for frames;
- beginning of installation of wooden frames of houses;
- installation of racks, beams and the first wall elements;
- transition from the foundation stage to the construction of the main structures of buildings.